Digital Signage – For the Purchaser

Purpose Provide the purchaser with an efficient and logical procedure for obtaining approvals, clarifying technical requirements, and ordering everything needed before new information screens or door signs are installed

Plan and clarify

Question Checklist
What will be displayed? Type of content, how often it is displayed, accessibility requirements
Where will it be placed? Building, floor, room number
What is already in place? Network socket, power outlet, mounting point

Step 1: Obtain approval from the Property Department

  1. Go to Eiendomstjenester.
  2. Select “Signs/marking” → “Order sign”.
  3. Complete the form and provide
    • Describe assignment (information screen, door sign, etc.)
    • Desired location (building, room, height on the wall)
    • Photos of the location, if possible
  4. Submit the form and wait for confirmation and a site?survey appointment.
  5. Contact the IT Department to confirm their participation in the site survey together with the Property Department.

Step 2: Mandatory site survey

Arrange a joint site survey with the Property Department and the IT Department. The survey will clarify the following:

Role Tasks during the survey
Property Department
  • Building?related conditions (e.g., wall mounting, conservation status, fire safety)
  • Regulations for outdoor installations or protected buildings
IT Department Checks the network socket and power supply

No installation may commence until the Estate Department has given its approval.

Step 3: Order data network and power supply if required

Electrician services

  1. Find a supplier in the Contract Catalogue.
  2. Contact the supplier and arrange a site survey.
  3. The Telephone Service can assist the electrician with
    • Tracing cable routes and telematics rooms
    • Advice on tools and installation
    • Updating floor plans

Telephone Service

Purchase process – step by step

  1. The purchaser submits the online form “Order digital signs”.
  2. The supplier confirms the details (phone/email).
  3. The supplier arranges a site survey (within three weeks).
  4. The purchaser invites the IT Department and the Property Department.
  5. The site survey is carried out and requirements are identified.
  6. The purchaser receives a quotation from the supplier.
  7. The purchaser places the order, quoting framework agreement ANSK?23?0374.
  8. The supplier confirms the order.
  9. A work order is created, MAC addresses are registered and user access is secured. The IT Department prepares the network.
  10. The equipment is delivered and installed.
  11. The supplier hands over operations, provides a user manual and sets up monitoring and reporting in My Atea.
  12. The purchaser inspects and approves the delivery.
Tags: Digital, Signage, Preparations, Purchaser, Purpose, Procedure, Plan, Clarify, Question, Checkpoints, Displayed, Content, Frequency, Accessibility, Building, Floor, Room, Network, Outlet, Power, Socket, Mounting, Permission, Property, Manager, Services, Signs, Marking, Order, Form, Sign, Information, Screen, Door, Location, Outdoor, Height, Photo, Site, Contact, Inspection, IT, Department, Survey, Role, Task, Conditions, Structure, Heritage, Status, Fire, Safety, Regulations, Installations, Planning, Data, Point, Telecommunications, Cost, Capacity, Supplier, Electrical, Configure, Connection, Equipment, Supply, UiO, Agreement, Catalog, Campus, Details, Electrician, Cable, Routes, Comms, Rooms, Cabinets, Tools, Methods, Plans, Email, Phone By Bernt Brundtland